Skip to main content

Bathroom Remodeling in Staten Island, NY

Get Free Quote Call Now

For APPLE MASONRY INC, a Staten Island bathroom remodel means demolition, a waterproofed shower wall, tile set level with tight joints, and fixtures installed before the final walkthrough.

APPLE MASONRY INC takes on bathroom remodeling in Staten Island, NY with the same crew that sets our patios and stoops. We strip old tile and fixtures, waterproof wet walls, set new tile level with tight joints, and install vanities and fixtures in Queens and Bronx homes. Fair pricing, straight answers, and a clean room at the end.

Get a free estimate

Get my free estimate

What are the key facts about Bathroom Remodeling?

Price range

Request an estimate

Turnaround

Most full bathrooms: 2-3 weeks

Areas served

Staten Island, Brooklyn, Queens, Bronx, Manhattan and nearby NJ cities

Contact

(347) 836-3855

What does Bathroom Remodeling include?

  • Demolition and haul-away of old tile, fixtures, and vanity
  • Subfloor and wall prep with waterproofing membrane in wet areas
  • Porcelain or ceramic tile set level with tight, even joints
  • Vanity, toilet, and fixture installation
  • Shower pan or tub set with correct pitch toward the drain
  • Final walkthrough and full job site cleanup

Where is Bathroom Remodeling available?

We offer bathroom remodeling to customers across the region. Tap any area for full local details.

See the work

All services

What do customers ask about Bathroom Remodeling?

Common questions and tips from our work with Staten Island customers.

How long does a full bathroom remodel take?

Industry sequencing for a full bathroom runs in the range of a few weeks, and the stages are what set the pace. Demolition and rough prep take the first days, the waterproofing membrane needs a full day before tile, and thinset and grout call for 24 to 48 hours of cure between stages. Fixtures go in near the end, then details and cleanup.

What happens on the first day of work?

Day one is demolition and protection. We cover floors along the path to the door, shut off and cap the water supply, then strip the old tile, vanity, and fixtures down to the studs or slab where needed. Debris goes out the same day, not stacked in your hallway. Before we leave, the crew confirms the scope for day two with you.

Do you waterproof the shower before tiling?

Always. Tile and grout alone are not a waterproof barrier, so every shower gets a waterproofing membrane over cement board before a single tile goes up. Corners and seams get sealed, then the pan gets flooded or moisture-tested where the plumbing setup allows it. That step is what keeps water out of the ceiling below, which matters in any Staten Island multi-family building.

Pick your tile before demolition starts

Order tile, vanity, and fixtures before the crew begins tearing out the old bathroom. Standard field tile often ships in a week or two, but special-order mosaics and slabs can take longer, and an empty bathroom waiting on a delivery is the most common cause of a stalled remodel. Having materials on site lets the work move day to day without gaps.

Can one crew handle the whole bathroom job?

Yes. The same masonry and tile crew that builds our Staten Island patios and stoops handles the demolition, wall prep, and tile setting in your bathroom, and we bring in the right trades for the plumbing connections so the schedule stays under one foreman. You deal with one point of contact from the first walkthrough through the final day.

Staten Island, NY
Phone: 929-460-8332