Kitchen Remodeling in Staten Island, NY
Kitchen remodeling covers cabinets, countertops, flooring, tile and lighting, rebuilt room by room with measurements checked before any demolition starts.
APPLE MASONRY INC provides kitchen remodeling for Staten Island homeowners, covering cabinet installation, countertops, flooring, tile and lighting. Measurements get checked before demolition starts, cuts stay straight, and the work area is cleaned up at the end of each day. Homes across Staten Island and the greater NYC area, from rowhouses to apartments, get a kitchen rebuilt to the agreed plan.
Get a free estimate
What are the key facts about Kitchen Remodeling?
Price range
Request an estimate
Turnaround
Most remodels: 2-4 weeks
Areas served
Staten Island, Brooklyn, Queens, Bronx, Manhattan and nearby NJ cities
Contact
(347) 836-3855
What does Kitchen Remodeling include?
- Measurement check and layout review before any demolition starts
- Cabinet and countertop installation set level and square
- Flooring, backsplash tile and lighting installed to the plan
- Plumbing and fixture hookups coordinated around the schedule
- Daily cleanup so your Staten Island home stays livable during the work
- Final walkthrough with the foreman before we call it done
Where is Kitchen Remodeling available?
We offer kitchen remodeling to customers across the region. Tap any area for full local details.
What other services go with Kitchen Remodeling?
What do customers ask about Kitchen Remodeling?
Common questions and tips from our work with Staten Island customers.
How do I prepare my kitchen before the crew arrives?
Clear the counters and empty the lower cabinets into labeled boxes so nothing gets buried during demolition. Unplug small appliances and set up a coffee station or temporary sink elsewhere, since water runs off for a few days at the rough-in stage. Keep a clear path from the door to the kitchen. In city rowhouses and brownstones, an open hallway makes a real difference in how fast materials move.
Should I order my own appliances and fixtures first?
Order the big items before demolition starts. A range, refrigerator and sink have exact dimensions, and cabinet boxes get built around them. If a dishwasher or fridge arrives after the cabinets are set, the fit can be off by half an inch and that shows. Bring the spec sheets to the walkthrough so the layout gets checked against them before any wall or cabinet goes in.
What does a typical kitchen remodel take?
Timelines vary with scope, and the range gets confirmed at your walkthrough before work begins. A cabinet-and-countertop refresh with tile moves faster than a remodel that moves plumbing or opens walls. Backsplash tile alone needs a full day to set before grouting, and grout generally needs about 72 hours to cure before heavy use. Ask for the schedule in writing at the estimate stage.
Pick finishes before the first cabinet goes in
A backsplash tile with a 3/16-inch grout joint looks different from a 1/2-inch joint, and that choice affects the countertop edge and the outlet placement. Decide tile, countertop material, hardware and lighting before demolition starts, then everything gets installed once instead of twice. For Staten Island kitchens, where every inch of counter and wall counts, locking those choices early is the single habit that keeps a remodel on schedule.
Phone: 929-460-8332